We use own and third-party cookies to improve our services and show information related to your preferences by analyzing your browsing habits. If you continue browsing, it shall be deemed you are accepting their use.
More info Understood

Tedagua

الأخبار
الاتصال
المكاتب المركزية :
Cardenal Marcelo Spinola 10
28016 Madrid
SPAIN
Tel: +34 91 456 95 00
central@tedagua.com

عناوين أخرى

الأخبار

Writen by Tedagua: 2016-07-27

Tedagua wins a water supply contract in Sri Lanka worth 97 million euros

On the 17th of May this year, the Sri Lanka council of ministers gave a green light to awarding this contract to the consortium led by Tedagua, also comprising the companies Makiber and Cobra, all of which form part of the ACS g...

Read more


Writen by Tedagua: 2016-07-08

Tedagua will participate as a Gold Sponsor at Singapore International Water Week 2016

Singapore International Water Week 2016 will be held from 10-14 July at the Marina Bay Sands Expo and Convention Centre and Tedagua is proud to be participating at the event as a Gold Sponsor.  Singapore International ...

Read more


Writen by Tedagua: 2016-06-03

Singapore’s Permanent Secretary for the Environment and Water Resources visits Tedagua’s stand at Singapore International Water Week 2016

A highlight of Tedagua’s participation at Singapore International Water Week was the visit to Tedagua’s stand by Singapore’s Permanent Secretary for the Environment and Water Resources, Mr Choi Shing Kwok.  ...

Read more


Writen by Tedagua: 2016-02-26

Tedagua achieves milestone with deal on Singapore’s Tuas Desalination Plant 3

Tedagua has achieved a new first, having played a significant role in the success of Singapore contractor, HSL  Constructor Pte Ltd being awarded the construction contract for Singapore’s Tuas Desalination Plant 3 by...

Read more


Writen by Tedagua: 2015-07-10

City of Murray awards Tedagua contract worth over €40 million for extension to Bee Creek WWTP

Tedagua, through the US subsidiary of the Cobra Group, Cobra Industrial Services Inc., has secured an exclusive new contract in the Kentucky state and more precisely with City of Murray. The works, valued at 45,138,000 USD (arou...

Read more


Writen by Tedagua: 2015-06-15

Tedagua will upgrade the water pipelines networks at the main seven cities of the Rumanian region of Maramures

Tedagua, as leader of the Tedagua – S.C. IMI S.A. consortium, has won a new contract with S.C. Vital S.A., the utility responsible for drinking water supply, and wastewater collection and treatment in the region of Maramur...

Read more


Writen by Tedagua: 2015-04-09

Tedagua to build new filtration facilities at Richmond Road DWTP in Lexington (Kentucky, USA)

Cobra Industrial Services Inc., the US subsidiary of the Cobra Group has secured the first contract in the USA for the Cobra Medio Ambiente division. The $14,265,285.00 USD contract was awarded by Kentucky American Water to cons...

Read more


Writen by Tedagua: 2015-01-12

Tedagua to build €33 million sludge energy recovery system at Dr. Hélio Seixo de Brito WWTP in Goiânia (Brazil)

SANEAGO, the Goiânia Sanitation Company has awarded the contract for the design and construction of the sludge energy recovery system at the Dr. Hélio Seixo de Brito WWTP, in the capital city of the state of Goi&aacut...

Read more


Writen by Tedagua: 2014-10-01

Tedagua strengthens its presence in Romania with two new drinking water infrastructure contracts

Last September, Tedagua increased its backlog in Romania by over 13 million Euros, after the award of two new contracts in the provinces of Botosani and Mures. On 2nd September 2015, Tedagua and SC Nova Apa Serv S.A., the water...

Read more


Writen by Tedagua: 2014-06-27

Tedagua is to manage the operation and maintenance of reuse and desalination facilities on the island of Tenerife

The Local Public Corporate Entity Balsas de Tenerife (BALTEN) has entrusted the Joint Venture (JV) formed by Tedagua (80%) and Syocsa-Inarsa (20%), with the operation, maintenance and conservation of the reuse and desalination fac...

Read more


Writen by Tedagua: 2014-05-12

Signing of the concession contract for the Sanitation Services Provision project in the Southern Districts of Lima.

Today, the Ministry of Housing, Construction and Sanitation (MVCS) of Peru and the company Sociedad Concesionaria Desaladora del Sur S.A. (60% of which is controlled by Tedagua and 40% by Cobra Instalaciones y Servicios), signed t...

Read more


Writen by Tedagua: 2014-04-08

L'UTER de Taboada remporte le prix de la meilleure station de traitement des eaux résiduaires décerné par Global Water Intelligence

  L'usine de traitement des eaux résiduaires (UTER) de Tabaoba (Lima) construite par Tedagua et mise en service courant 2013, a été reconnue comme étant la meilleure de l'année lors des G...

Read more


Writen by Tedagua: 2014-02-13

Federico Ramos et Alberto Núñez Feijoo inaugurent les travaux d'agrandissement et amélioration du système de traitement d'eau potable de Monforte de Lemos

Le secrétaire d'État à l'environnement du Ministère de l'agriculture, de l'alimentation et de l'environnement (MAGRAMA), Federico Ramos, et le président du Gouvernement régional de Galic...

Read more


Writen by Tedagua: 2014-01-23

L'ONAS du Sénégal confie à Tedagua la construction de la STEP de DISEZ

Le gouvernement du Sénégal, à travers son Office National de l'Assainissement (ONAS), a adjugé au consortium TEDAGUA / SVTP-GC le contrat de conception et construction de la nouvelle station d'ép...

Read more


Writen by Tedagua: 2014-01-02

Fin des travaux de l'UTER de Taboada et inauguration par le président du Pérou, Ollanta Humala

Le président péruvien, Ollanta Humala, a présidé l'inauguration de la troisième et dernière étape de l'usine de traitement des eaux résiduaires (UTER) de Taboada, où...

Read more